Greenhouse Gas Verification Statement - Posted Online
Greenhouse Gas Verification Statement - Posted Online
08
2024
/
05
2023 Annual Greenhouse Gas Emission Verification Report - Key Page for Public Disclosure
2023 Annual Greenhouse Gas Emission Verification Report - Key Page for Public Disclosure
08
2024
/
05
Carbon Footprint Assessment Report for 1t Wind Turbine Tower Cylinder Flange Products - Key Page for Network Connection
08
2024
/
05
Social Responsibility Case of Shanxi Baohang Heavy Industry Co., Ltd.
Shanxi Baohang Heavy Industry Co., Ltd. was established in May 2018, with Li Zhefeng as the legal representative. The company is located at No. 1 Tengda Road, Zhuangli Industrial Cluster Area, Yangfang Township, Dingxiang County, Xinzhou. It is a private enterprise with a registered capital of 80 million yuan. The newly built production line project for wind power flanges, with an annual output of 100,000 tons, has been rated as a key provincial project in Shanxi Province for four consecutive years from 2021 to 2024.
08
2024
/
05
Baohang Heavy Industry seizes the opportunity in the offshore wind power market.
The company invested 1.3 billion yuan to build a wind power flange project with an annual output of 100,000 tons, achieving the goal of construction and production in the same year. The first phase of the project has an annual output of 50,000 tons of wind power flanges, with an annual output value of 1 billion yuan, which can meet the current demand for offshore wind power flanges in the domestic market.
26
2021
/
09
Shanxi Dingxiang: The "Capital of Flanges" is Gaining Momentum
"From land acquisition to the official offline delivery of the first batch of 7.5-meter diameter offshore wind power flanges, the entire project took only 310 days, and the 'Dingxiang speed' is astonishing." In the Dingxiang Economic and Technological Development Zone of Shanxi Province, Li Zhefeng, general manager of Shanxi Baohang Heavy Industry Co., Ltd., told reporters from the China Economic Times that benefiting from the local business environment, they have achieved a closed-loop integrated production process for the first time, covering six major stages from blanking, ring rolling, heat treatment, machining to packaging and delivery."
26
2021
/
09